1. Home
  2. Roof systems
  3. Commercial Roof Replacement
Roof replacement & recovers

Commercial roof replacement, done once and done right.

When repairs and coatings stop making sense, we replace the roof as a complete system — insulation, drainage, edge metal and flashings — and plan it around the people inside.

Recover or tear off

A recover installs a new roof over the existing one. It's allowed when the existing roof is dry, structurally sound and there's no more than one existing layer. It saves tear-off and disposal and keeps the building open. When cores show wet insulation, those areas — or the whole roof — come off. We test before we recommend, and we price both when both are possible.

Our crew installing a new membrane roof on a commercial building

What a Mosaic replacement includes

  • Moisture testing and a written scope before the price, so there are no change orders for "surprise" wet decking we could have found.
  • Tapered polyiso insulation designed to move water to drains and scuppers, plus current energy-code insulation values.
  • New edge metal, curbs, pitch pans and penetration flashings — replaced as part of the system, not reused.
  • Your choice of system: GAF EverGuard TPO, Duro-Last PVC, EPDM, modified bitumen or standing seam metal or spray foam (SPF).
  • Permits, inspections and manufacturer warranty registration handled by us.

Built around an occupied building

  • Phased sections so tenants, congregations and customers keep operating.
  • Daily dry-in — no section left open overnight.
  • Early-morning, after-hours and weekend scheduling when the building needs it.
  • Rooftop unit coordination with your HVAC contractor and protection of interior spaces below active work.
  • One point of contact, with photo updates from start to closeout.
White membrane roofs on new multifamily buildings

Warranties and financing

GAF EverGuard 60-mil TPO roofs carry a 20-year material warranty plus Mosaic's 10-year workmanship warranty. Commercial financing is available through Regions Bank, and under current federal tax law, roofs on nonresidential buildings may qualify for accelerated depreciation (Section 179) — ask your accountant whether it applies to your property.

FAQ

Questions owners and managers ask.

How long does a commercial roof replacement take?

It depends on size, system and access. Many small to mid-size roofs are completed in days; larger roofs are phased over weeks. We give you a schedule with the proposal.

Can you replace our roof without closing the building?

Yes. We phase the work, dry in every section daily and schedule around operating hours.

Is a recover cheaper than a tear-off?

Usually, because it avoids tear-off and disposal. It's only an option when the existing roof tests dry and there's no more than one existing layer.

Commercial Division

Know what your roof needs before it leaks.

Free commercial roof inspection with a photo report and side-by-side options — repair, restore, recover or replace.

Call Text Free inspection